I'll back track over the last few weeks of training. I was keeping my training log over at strengthmill.com, but I got a virus on my computer from that site, so I'm not going back.
Mon. Sept 14
Low Incline (30 degree) Rack Press
worked up to 315 x 1, then did 250 x 8 (full pause between each rep)
DB Bench Press
3 x 10-8-6 x 85 lbs. I suck at these
Barbell Rows
3 x 10 x 185
Wednesday 9/16
Rack Pull (bar set right at patella tendon - weak spot for me)
535 x 1, 430 x 8
Front Squats
8 x 2 x 275 (90 sec rest)
Fri 9/18
Press
5 x 10 x 155
Reverse Grip Pulldowns
5 x 12 x 140 lbs
Dips
1 x 20 (bodyweight), 1 x 10 (bodyweight)
Saturday 9/19
Sled Dragging
Sled + 100 lbs, 400 yards, continuous effort, concrete
Thursday, October 8, 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment